24/7 Emergency Service
Havering coverage active

EICR (Electrical Installation Condition Report) Havering

NICEIC registered EICR inspections across Havering from £120 — 5-year landlord certificate, digital report within 48 hours, same-week booking.

Call 07456 975436

Landline: 0207 046 1363 · Covering RM1–7, RM11–14

East
Havering coverage
24h
Email response
RM1–7
Postcode covered
£120
From price tier

EICR (Electrical Installation Condition Report) across Havering

Electrician testing insulation resistance on a ring final circuit in Romford

Most EICR work in Havering falls into one of three patterns: a routine 5-year renewal on an already-compliant property where the inspection should pass clean, a first-time EICR on a property that has not been inspected since before the 2020 Regulations came in, or a remedial EICR re-issue after a previous Unsatisfactory report. The first is straightforward; the second and third need more care because older installations often throw up a cluster of C2 and C3 codes on the first pass. Our NICEIC registered electricians cover RM1–7, RM11–14 across Havering with sliding booking availability — same-week for standard domestic, same-day for portfolio landlord contracts, and out-of-hours slots for commercial sites where a daytime power-down would close the business. Properties we see regularly across Romford, Hornchurch, Upminster split roughly 50/50 between post-2008 new-build flats with 17th or 18th Edition consumer units that inspect clean in 2-3 hours, and pre-1990 terraces and conversions with a mix of original rewireable fuses, retrofitted plastic consumer units and borderline circuit loading that need a more careful testing approach.

Both are covered at the published fixed price with no postcode loading. Serving properties near Upminster Windmill, Hornchurch Country Park, and Romford Market.

Covering HaveringRomford, Hornchurch, Upminster

Havering is London's most easterly borough, covering Romford, Hornchurch, and the rural fringes near the Thames Estuary. With a high proportion of detached and semi-detached homes, plumbing systems here are older on average - and our engineers respond within 30–45 minutes. For eicr work specifically, our engineers service every postcode in the borough — RM1–7, RM11–14 — at the same fixed pricing, with no neighbourhood loading and no out-of-hours premium for weekday or Saturday bookings. Serving properties near Upminster Windmill, Hornchurch Country Park, and Romford Market.

Romford

EICR coverage across Romford and the surrounding RM1–7 streets.

Hornchurch

EICR coverage across Hornchurch and the surrounding RM1–7 streets.

Upminster

EICR coverage across Upminster and the surrounding RM1–7 streets.

What Havering eicr covers

EICR test lead connection on a domestic consumer unit during a Romford inspection

The full service breakdown. Every point below is standard on every Havering eicr booking we take — not upsells, not optional extras, not cost-extra items.

Visual inspection with photo evidence

Every accessible accessory, enclosure, consumer unit and length of wiring is visually inspected and recorded. Photographic evidence is captured against every numbered observation in the report. The consumer unit in particular is the most inspected item — enclosure rating, main switch, RCDs, RCBOs, MCBs and connections are all checked and photographed.

Dead testing with power isolated

Continuity of protective conductors (R1+R2), continuity of ring final circuits (Zs), insulation resistance at 500V DC between conductors and to earth, and polarity verification at every accessory. This section takes typically 45-90 minutes and requires the property to be powered down; we work with the tenant to isolate each circuit in sequence rather than the whole consumer unit at once where that is practical.

Live testing with power restored

Earth fault loop impedance (Zs) at the end of every circuit, Ze at the origin, prospective short-circuit current and prospective earth fault current. All tests logged against the BS 7671 maximum disconnection times for the protective device rating. Zs results outside tolerance flag an immediate C1 or C2 code and a remedial investigation.

RCD and RCBO trip-time measurement

Every residual current device (30mA RCD, 100mA time-delayed RCD, and any RCBO) is tested at half, full and five times rated residual current. Trip times are recorded in milliseconds against the BS EN 61008/61009 maximum disconnection times. RCDs outside tolerance are replaced the same day from van-stock if the landlord authorises the remedial.

Full circuit schedule written up

A comprehensive circuit schedule is completed in the BS 7671 model format listing every circuit with its function, conductor csa, protective device rating, maximum Zs, measured Zs, insulation resistance, polarity verification, and any coded observation. The schedule becomes part of the digital PDF and forms the audit trail for any future EICR cycle.

C1/C2/C3/FI coding with photographic evidence

Every observation is classified under the BS 7671 coding scheme: C1 Danger Present (immediate make-safe required), C2 Potentially Dangerous (28-day remedial), C3 Improvement Recommended (advisory only, does not fail the inspection), or FI Further Investigation (inspection blocked, report cannot complete without further work). Every code carries a photograph in the final report.

Digital report in BS 7671 model format

The final report is issued as a digital PDF in the BS 7671 model format, signed by the attending NICEIC registered electrician and countersigned by the NICEIC Qualified Supervisor. It is emailed within 48 hours of the on-site inspection and stored against the property record in our system for the full 5-year cycle so a lost copy is re-sent inside minutes of a phone call.

How a Havering eicr booking runs

Step-by-step process for every eicr visit across RM1–7, RM11–14. Consistent whether we are attending a single flat or a portfolio account.

1

Initial booking

Ring or email with property address, number of circuits if known, and tenant contact. Booking window 3-5 working days for domestic, same-day for priority landlord contracts, out-of-hours slots reserved for commercial sites.

2

Arrival and tenant brief

Electrician arrives inside the booked window with photo NICEIC ID, explains the test sequence to the tenant, and sets expectations about power-down windows. Isolations are sequenced circuit-by-circuit to minimise disruption.

3

Visual inspection

Consumer unit, accessories, wiring, enclosures, main earth bonds, equipotential bonding and supply arrangements visually inspected and recorded with photographs. Any immediately obvious C1 defect is made safe before testing continues.

4

Dead testing (power off)

Continuity R1+R2, ring final circuit continuity, insulation resistance at 500V DC, polarity verification. Circuit-by-circuit isolation sequence. Typically 45-90 minutes depending on circuit count.

5

Live testing (power restored)

Ze at origin, Zs at end of every circuit, PSCC and prospective earth fault current at the origin. Every reading logged against BS 7671 maximum disconnection times. Typically 30-60 minutes.

6

RCD and RCBO functional test

Every RCD and RCBO tested at 0.5x, 1x and 5x rated residual current. Trip times recorded in milliseconds. Failing devices flagged for same-visit replacement from van-stock if landlord authorises.

7

Report writeup and issue

Full circuit schedule, numbered observation list with C1/C2/C3/FI codes and photographs, final summary page. Digital PDF signed by the attending engineer and the Qualified Supervisor, emailed within 48 hours.

EICR pricing in Havering

Identical to our London-wide published pricing. No RM1–7 loading, no Havering surcharge. Quote on the phone matches the invoice.

1-bed flat
£120–£180
Up to 6 circuits, single consumer unit, one RCD group
2-bed flat / house
£160–£220
Up to 8 circuits, full fixed-wiring inspection
3-bed house
£200–£280
Up to 10 circuits, 2 RCD groups, garden supply
4–5 bed house
£280–£400
10+ circuits, separate outbuilding supply, EV/cooker circuits
HMO (5+ occupants)
£300–£500
Landlord circuits plus individual unit sampling, emergency lighting check
Small commercial (office)
from £350
Up to 20 circuits, 3-phase incomer, emergency lighting spot check
Commercial (full building)
POA
Full installation, DB sampling schedule agreed in advance, out-of-hours available
Portfolio landlord contract (5+ properties)
10% discount
Consolidated monthly invoicing, reminder calendar, priority booking

Full breakdown on the pricing page or the main EICR London page.

Why choose us for Havering eicr

Completed Satisfactory EICR paperwork for a landlord in Havering

Our EICR report format has been refined over hundreds of Havering inspections to match what every London borough's housing enforcement team, every major landlord insurer and every lettings agency compliance officer expects to see. Full circuit schedule with conductor cross-sectional area, protective device rating, disconnection time and Zs result for each circuit. Every RCD and RCBO test result at 0.5, 1 and 5 times rated residual current with tripping times in milliseconds.

Visual inspection schedule with numbered observations and photo evidence against every C1, C2, C3 and FI code. Final summary page signed by the attending electrician and the NICEIC Qualified Supervisor with the 7-digit scheme registration number. We have not had a Havering council or insurer challenge the format of our EICR in the last three years.

EICR Havering — FAQ

Borough-specific questions plus the general eicr questions we get asked most often.

How do I book an EICR in Havering?

+

Ring 07456 975436 or email with the property address, approximate circuit count (or just a 'X-bed flat' description if you don't know), and tenant contact details. We cover every postcode in Havering across RM1–7, RM11–14 with typical booking windows of 3-5 working days for standard domestic jobs, same-day for portfolio landlord contracts, and out-of-hours slots reserved for commercial sites where a daytime power-down would disrupt trading.

Do you cover Romford, Hornchurch and Upminster?

+

Yes — every Havering neighbourhood is inside our standard coverage area at the same fixed pricing. Romford, Hornchurch and Upminster see a steady flow of EICR renewals every month. Serving properties near Upminster Windmill, Hornchurch Country Park, and Romford Market. Our NICEIC registered electricians work across RM1–7, RM11–14 with no postcode loading and no neighbourhood surcharge.

What's a typical EICR cost for a Havering rental?

+

Fixed tiers apply across East London: 1-bed flat £120-£180, 2-bed £160-£220, 3-bed house £200-£280, 4-5 bed £280-£400. HMOs with 5 or more occupants £300-£500 depending on unit count. Small commercial (office, retail unit) from £350. All prices include VAT, the digital BS 7671 report, and a phone consultation on any findings before the report is finalised. Portfolio landlord contracts on 5+ Havering properties get a 10 per cent discount plus consolidated monthly invoicing.

Is the EICR valid for 5 years?

+

In the private rented sector, yes — the default review period under the 2020 Regulations is 5 years unless the inspecting electrician records a shorter period on the report itself (1 or 3 years on installations with known faults under watch). Owner-occupier EICRs in England have no statutory renewal period but 10 years is the common guidance in BS 7671 Part 6.

How long does an EICR inspection take?

+

A 1-bed flat takes 2-3 hours on site. A 3-bed house with two RCD groups is 3-4 hours. HMOs and small commercial premises are a half-day to a full day depending on the number of distribution boards and circuits. The inspection is part-live and part-dead testing, so the power does need to be off for sections of the visit — we sequence circuit-by-circuit to minimise disruption.

Do short-term lets and Airbnb properties need an EICR?

+

Yes. Airbnb, Booking.com and Vrbo hosts are treated as landlords under the Electrical Safety Standards 2020 because each booking is a short tenancy. Most London boroughs with Additional or Selective Licensing explicitly request a current EICR for short-let properties, and an increasing number of host platforms now require one as part of listing verification.

What happens if my property fails the EICR?

+

Under the Electrical Safety Regulations 2020 the landlord has 28 days from the date of the report to complete all C1, C2 and FI remedial work and obtain written confirmation from a qualified electrician that the work was carried out. The landlord must then provide that confirmation to the tenant within 28 days and to the local authority within 28 days of any request. In roughly seven out of ten C1 and C2 findings our electrician completes the fix from van-stock on the same visit.

What do C1, C2 and C3 codes mean?

+

C1 Danger Present means immediate action is required — typical examples include exposed live conductors, a consumer unit with no earth, or a cooker isolator with a burnt bus-bar. C2 Potentially Dangerous means the fault could cause injury under certain circumstances — missing RCD on a bathroom circuit, undersized tails, missing earth bond. C3 Improvement Recommended is advisory — older but serviceable consumer units, lack of RCD protection on circuits that do not currently require one. C1 and C2 both make the installation Unsatisfactory; C3 does not.

Book eicr in Havering

An engineer — not a call centre — answers the phone, takes the property address, and books the next available slot across RM1–7, RM11–14.

Call 07456 975436

Landline: 0207 046 1363

24/7 EMERGENCIES
0207 046 1363